Roadwork
What's torn up, and until when
Planned roadwork and detours in Edmonton and Calgary — the weeks-and-months view the live closure map can't give you. Each entry carries the city's own description, including the detour where they publish one.
Jobs on the go
217
128 Edmonton · 89 Calgary
Close a road
123
full or directional closures
Done within two weeks
101
relief in sight
Not started yet
20
coming to a street near you
Updated November 22, 2026 at 12:00 a.m.
Edmonton
82 jobs on the go or about to start, the ones finishing soonest first.
- Gateway Boulevard NW (61 Avenue NW to 63 Avenue NW)
Ends today
Gateway Blvd reduced to two lanes. 63 AV eastbound, 104ST - Gateway reduced to a single lane.
Increased Travel Time - 97 Street NW (105A Avenue NW to 106A Avenue NW)Not started yet
November 23 to November 23
97 Street will be reduced to a single lane each direction. No left turns permitted for both directions. 106 Ave westbound will be reduced to a single lane. No left turn permitted. All work between 9am - 3:30pm.
Travel Delays - 97 Street NW (128 Avenue NW to 125A Avenue NW)
Ends tomorrow
Phase 1 - Until Noon on Monday, November 23, 97 Street outside two lanes closed from 128 Ave to North of 125A Ave (under the CN bridge). Keep left. Detour using other routes. Phase 2 - After Noon on Monday, November 23, 97 St inside lane closed from North of 127 Ave to North of 125A Ave (under the CN bridge). Keep right, two Southbound lanes maintained. Detour using other routes Northbound 97 St locked to three lanes from 118 Ave to 127 Ave
Travel Delays - 106 Street NW (Jasper Avenue NW to 102 Avenue NW)
Ends tomorrow
106 St from the alley north of Jasper Av to 102 Av, is closed. The east sidewalk will also be closed; use the west sidewalk.
Total Closure - 121 Avenue NW (97 Street NW to 101 Street NW)
Until November 24
121 Ave from 101 Street east to alley will be total closed full time. Use 120 Ave or 122 Ave for detour
Total Closure - 112 Street (98 Avenue to 99 Avenue)Not started yet
November 24 to November 24
Beginning at 9 a.m. on Tuesday November 24, 112 Street will be closed from 98 Avenue to 30m north of 98 Avenue for Crane Lift. As part of the work, the sidewalk will be closed on the west side of 112 St adjacent to 9804 112 Street. Both the road and sidewalk are scheduled to reopen at 3 p.m. on the same day.
Increased Travel Time - 124 Avenue NW (66 Street NW to 67 Street NW)
Until November 25
124 Ave closed from 66 St to West of 67 St. 67 St and 124 Ave intersection open to Northbound and Southbound traffic.
Total Closure - 105 Street (Walterdale Bridge to 105 Street)
Until November 27
Beginning at 9 a.m. on Friday November 6, 105 Street is reduced to three lanes northbound from Walterdale Bridge to the south side of River Valley Road. Left curb lane closed.
Increased Travel Time - River Valley Road (Groat Road to Emily Murphy Parkway)
Until November 27
Beginning Monday November 9, EPCOR Water Services utility work will reduce the vehicle travel lanes eastbound along River Valley Road at the entrance to Victoria Park Golf Course. Left turns maintained from single vehicle lane eastbound. Construction Zone Max 30.
Travel Delays - River Valley Road (Fort Way Drive to 105 Street)
Until November 27
Beginning at 9 a.m. on Friday November 6, River Valley Road is reduced to one lane eastbound from 140m west of 105 Street to 105 Street. Left turn bay and centre lane maintained.
Increased Travel Time - Churchill Crescent NW (102 Avenue to 103 Avenue)Not started yet
November 24 to November 27
Total closure on Churchill Crescent NW from 102 Avenue to 103 Avenue, At night off peak hours.
Total Closure - Jasper Avenue NW (114 Street NW to 121 Street NW)
Until November 27
Jasper Av is reduced to one lane in each direction. 114 St to 124 St will be closed at various times to accommodate the work. Sidewalks will be closed in various phases for replacement.
Travel Delays - 92 Street NW (106A Avenue NW to 107 Avenue NW)
Until November 27
92 Street will be total closed. Pedestrians and LRT will be unaffected.
Total Closure - 100 Avenue NW (105 Street NW to 104 Street NW)
Until November 27
Westbound Directional Closure on 100 Ave from 105 Street to 104 Street, Eastbound traffic Maintained. Bike lane Closure, dismount and walk conditions in place. Please use other routes.
Directional Closure - 122 Street NW
Until November 27
Alternating lane closures within the intersection during off-peak hours (09:00-15:30).
Increased Travel Time - 79 Avenue (109 Street to 110 Street)Not started yet
November 23 to November 27
79 Ave and south sidewalk will be closed to vehicle and pedestrian access in front of address 10903 79 Ave NW. Pedestrians will be detoured to north sidewalk.
Total Closure - 107 Street NW (129 Avenue NW to 130 Avenue NW)Not started yet
November 28 to November 29
The remaining single Northbound lane on 107 St, North of 129 Ave will be closed from 7AM on Saturday, November 28 until 5PM on Sunday, November 29. Local access maintained via alleys.
Total Closure - Jasper Avenue NW (83 Street NW to 87 Street NW)Not started yet
November 23 to November 29
Jasper Ave westbound will be reduced to a single lane full time.
Major Delays - Graydon Hill Boulevard SW (9 Avenue SW to Graydon Hill Point SW)
Until November 30
Graydon Hill Blvd is reduced to a single lane per direction between Ellerslie Road and Graydon Hill Way SW. Temporary pedestrian detours in place. Expect travel delays
Travel Delays - Ellerslie Road SW (127 Street SW to Heritage Valley Trail SW)
Until November 30
Starts November 9th. Ellerslie Rd will be reduced to a single per direction at Heritage valley trail. Expect travel delays.
Travel Delays - 111 Street (9 Avenue to 19 Avenue)
Until November 30
Reduced to one lane each direction
Increased Travel Time - 121 Street NW (Yellowhead Trail to Bush Pilot Road)
Until November 30
121 St closed from Yellowhead Trail to South of Yellowhead Trail. Eastbound and Westbound thru movements only at the intersection. Detour using 156 St, St Albert Trail, 127 St, 107 St, or 97 St
Total Closure - 184 Street SW (28 Avenue SW to 41 Avenue SW)
Until November 30
184 Street SW will be closed from 28 Avenue SW to 41 Avenue SW. Use other routes.
Permanent Closure - Heritage Valley Trail SW (Anthony Henday Drive NW to Ellerslie Road SW)
Until November 30
Starts Oct 22nd. Heritage Valley Trail will be reduced to a single lane per direction from Anthony Henday Drive to Ellerslie Rd. All turning movements maintained at the Ellerslie Road intersection. Expect travel delays.
Travel Delays - 76 Street NW (101 Avenue NW to 99 Avenue NW)
Until November 30
Road segment closed to vehicle traffic. Detour using alternate routes.
Total Closure - 101 Avenue NW (74 Street NW to 76 Street NW)
Until November 30
101 AV eastbound and westbound reduced to a single lane in each direction with alternating traffic splits.
Increased Travel Time - 103A Avenue NW (97 Street NW to 100 Street NW)
Until November 30
103A Ave reduced to a single lane in each direction from 97 St - 100 St. North sidewalk closed from 99 St - 100 St.
Travel Delays - 79 Street NW (112 Avenue NW to 115 Ave NW)
Until December 1
79 Street NW Full closure from 112 Ave - 115 Ave.
Total Closure - Groat Road (Victoria Park Road to 102 Avenue NW)Not started yet
November 28 to December 1
Groat Road will be reduced to 1 lane in each direction starting at 7am on Saturday, November 28 until 3pm on Tuesday, December 1. Use other routes.
Travel Delays - 102A Avenue NW (100 Street NW to 101 Street NW)
Until December 2
North sidewalk closed, pedestrian detour to south sidewalk. 102A Ave reduced to single lane in each direction.
Increased Travel Time
Showing the 30 finishing soonest, of 82. The map above has all of them.
Calgary
89 jobs on the go or about to start, the ones finishing soonest first.
- Barlow Trail and 128 Avenue NE
Ends today
Phase 1 Start: Friday, November 13 @ 9:00 AM Phase 1 End: Monday, November 16 @ 6:00 AM Traffic Impacts: • Road closure on northbound Barlow Tr NE and 128 AV NE, detour inplace. • Speed reduced to 50km/hr. Phase 2 Start: Monday, November 16 @ 6:00 AM Phase 2 End: Saturday, November 21 @ 7:00 PM Traffic Impacts: • Road closure on northbound Barlow Tr NE and 128 AV NE. • Two-way traffic on southbound Barlow Tr NE at 128 AV NE. • Speed reduced to 50km/hr
- 8 Street between 8 Avenue and 10 Avenue SW
Ends today
Traffic Impacts: 8 St northbound full closure between 8-10 Av SW. Northbound traffic using the SB lane. 8 St southbound traffic follow detour route. 8 ST SW northbound closure between 10-11 AV SW, TWT on the W/S. Drive with caution.
- 15 Avenue between 9 ST and 10 ST SW
Ends today
Road closure, cycle track closure, and south sidewalk closure on 15 AV & 9-10 ST SW Follow detour signs and flaggers signs
- 40 Street at 80 Avenue NE
Ends today
Left Lane Closure on 40 St & 80 Ave NE
- 5 Street between 5-6 Avenue SW
Ends tomorrow
Phase1 : Nov 13 9am - Nov 16 5am. 2 left lanes and cycle track closure on 5 St between 5-6 Av SW. • Phase 2: Nov 16 5am - Nov 22 11pm. Left Lane and cycle track closure on 5 St between 5-6 Av SW.
- Royal Avenue SW between 9 Street and 10 Street SW
Ends tomorrow
24/7 Road closure of Royal Av between 9 St & 10 St SW. Use the detour route
- 4 Avenue between 4 Street and 5 Street SWNot started yet
November 23 to November 23
2 right lanes closure with condition: the 4 Av & 5-6 St SW hoarding site needs to reopen the left through lane during this setup.
- 16 Avenue and 6 Street NE
Ends tomorrow
Westbound right lane closureon 16 AV NE at 6 ST NE. Road closure on 6 ST NE between 17 AV NE and 16 AV NE, detour in-place. Alley closure between 16 AV NE and 17 AV NE.
- Briar Crescent and 21 Street NW
Ends tomorrow
Intersection closure in all three directions, sidewalk closed on the south side.
- 4 Avenue between 4 Street and 5 Street SW
Ends tomorrow
3 right lanes closure. Drive with caution.
- 5 Street between 5-6 Avenue SW
Ends tomorrow
Cycle track and single left lane closed (two lanes open
- 5 Street between 5 Avenue and 6 Avenue SW
Ends tomorrow
Left Lane and cycle track closure on 5 St between 5-6 Av SW.
- Seton Way between Seton Drive and Seton Crescent SE
Ends tomorrow
Full road closure on Seton Way SE between Seton Dr & Seton Cr SE. Follow detour or use alternate route.
- 4 Avenue between 4-5 Street SW
Ends tomorrow
Three right lanes closed (one lane open).
- Southland Drive and Macleod Trail SENot started yet
November 24 to November 24
Mobile Right Lane Closure
- 114 Avenue between 27 and 29 Street SE
Until November 24
Southbound closure between 29 Street and 27 Street at 114 Avenue & north curb lane closed on eastbound 114 AV SE at 29 ST
- 10 Avenue between 4 Street and 7 Street SW
Until November 24
Right lane closure southbound on 7 Street between 10 Avenue and 11 Avenue SW. Right lane closure northbound on 4 Street between 10 Avenue and 11 Avenue SW. Road narrowing eastbound on 10 Avenue at 4 Street SW. Only one work area narrowing on 10 Avenue is permitted at a time to maintain a 3.3-metre lane width.
- Country Hills Blvd and Cornerstone Street NE
Until November 24
Sidewalk Closure and Right Lane Closure on Country Hills Bv & Cornerstone St NE
- Memorial Drive and 68 Street SE
Until November 24
Two-Way Traffic Setup on Memorial Dr and 68 St SE
- 1 Avenue and Edmonton Trail NENot started yet
November 24 to November 24
Right Lane Closure on 1 Ave and Edmonton Tr NE
- Macleod Tr and Shawnessy Blvd SW
Until November 25
Daily southbound right lane closure on MacLeod Tr S at Shawnessy Blvd SW. Expect Delays.
- 3 Street between 4-5 Avenue SW
Until November 25
NPAT 3 St from 4-5 Ave SW (East side 25m)
- 16 Avenue at 5 Street NE
Until November 27
Right Lane Closure on 530 16 Ave NE
- Richmond Road and 42 Street SWNot started yet
November 27 to November 27
Left lane closure on eastbound and westbound Richmond Rd at 42 St SW
- 4 Avenue between 5 Street and 6 Street SWNot started yet
November 24 to November 27
Daily November 16 and 17, and November 26 and 27. 4 Ave two left lane closure between 5 St and 6 St SW. Drive with caution.
- 34 Avenue at 73 Street NW
Until November 27
Eastbound Parking Closure + Road Closed on 73 St NW b/w 34 Av NW - Bonita Cr NW
- City-Wide Banner RemovalNot started yet
November 28 to November 29
Remove Banners as per locations: 1. 33 Ave and 25 St SW West Side Pedestrian Bridge 2. Country Hills Blvd and Sanderling Dr NW West Side Pedestrian Bridge 3. McKnight Blvd and 44 St NE East Side Pedestrian Bridge 4. 14 St and 110 Ave SW North Side Pedestrian Bridge 5. 16 Ave and University Blvd/West Campus Blvd NW West Side Pedestrian Bridge 6. Crowchild Tr and Varsity/Dalhousie NW East Side Pedestrian Bridge 7. John Laurie Blvd and Brisebois Dr NW West Side Pedestrian Bridge 8. McKnight Blvd and 1A St NE East Side Pedestrian Bridge 9. Metis Tr and 64 Ave NE South Side Pedestrian Bridge 10. Bow Tr and Balsam Dr SW West Side Pedestrian Bridge 11. John Laurie Blvd and Brisebois Dr NW East Side Pedestrian Bridge 12. John Laurie Blvd and Huron Ave NW East Side Pedestrian Bridge 13. McKnight Blvd and 1A St NE West Side Pedestrian Bridge
- 36 Street between Sunridge Way and 20 Avenue NE
Until November 30
Southbound right lane closure on 36 Street between 20 Avenue and Sunridge Way NE weekdays from 9:00 AM to 3:00 PM or 9:00 PM to 5:00 AM. No restrictions on weekends. Right-turn bay closure from eastbound 20 Avenue to southbound 36 Street NE. No right turn on red. Right-turn bay closure from southbound 36 Street to westbound Sunridge Way NE. No right turn on red. Northbound right lane closure on 36 Street at Sunridge Way NE. Encroachment on the southbound 36 Street on-ramp to westbound 16 Avenue NE. Speed restricted to 50 km/h. Only one setup is allowed at a time.
- 36 Street at Sunridge Way NE
Until November 30
Southbound right lane closure on 36 Street at Sunridge Way NE. Eastbound right-turn bay closure on Sunridge Way at 36 Street NE. Trucks are prohibited from turning right from eastbound Sunridge Way to southbound 36 Street NE and must follow the signed detour. Speed restricted to 50 km/h. Only one setup is allowed at a time.
- 36 Street between 20 Avenue and 26 Avenue NE
Until November 30
Southbound right lane closure on 36 Street between 20 Avenue and 26 Avenue NE weekdays from 9:00 AM to 3:00 PM or 9:00 PM to 5:00 AM. No restrictions on weekends. Eastbound right-turn bay closure on 26 Avenue to southbound 36 Street NE. Southbound right-turn bay closure on 36 Street to 20 Avenue NE. Speed restricted to 50 km/h. Only one setup is allowed at a time.
Showing the 30 finishing soonest, of 89. The map above has all of them.
123 of these close a road or a direction of travel outright. Cities revise dates often — check the city's own page before planning around one, and the corridor pages for what is shut on the highways right now.
Common questions
- How much road construction is going on in Edmonton and Calgary?
- 217 jobs are under way or about to start — 128 in Edmonton and 89 in Calgary. 123 of them close a road or a direction of travel outright.
- Is this the same as road closures right now?
- No, and the difference is the point. This page is the planning horizon: what is torn up for the next weeks or months, until when, and where the detour goes. For what is closed this minute on a provincial highway, use the corridor pages and the live Alberta 511 map.
- When is construction season in Alberta?
- Roughly April to October, when the ground is workable. Outside that window you will mostly see emergency and utility work. Municipal crews publish next season's programme over the winter.
- Where does this information come from?
- Edmonton's traffic disruptions dataset and Calgary's construction detours and road projects datasets, both published as city open data and refreshed daily. Each city's own wording is shown as published.
More
Contains information licensed under the Open Government Licence – City of Calgary, and data published by the City of Edmonton. Descriptions are each city's own wording. Dates change often and this page is refreshed daily — the city pages linked above are authoritative. Provincial highway work is not included here; see the corridor pages for that.