Skip to content
Alberta DailyEst. 2026
NewsLethbridge

Highway 3 twinning finishes first phase between Taber and Burdett

Ledcor has completed new eastbound lanes along a 46-kilometre stretch of southern Alberta's Highway 3, a route carrying about 4,000 vehicles a day.

Why it matters

The upgrade aims to ease congestion and improve safety on a highway heavily used by farm and commercial traffic in southern Alberta.

The first phase of the Highway 3 twinning project between Taber and Burdett is now complete, with two new eastbound lanes added along the 46-kilometre stretch. Ledcor, the contractor on the highway construction, announced the milestone on Nov. 26, saying the new lanes were built alongside the existing highway to improve traffic flow, road access and intersections.

Work began in spring 2024 and involved moving nearly 3.5 million cubic metres of earth, laying more than one million tonnes of road base, and paving almost 500,000 tonnes of asphalt. The upgraded section also includes new rest areas, signage and overhead lighting.

Highway 3 is a key east-west route serving local agricultural communities and commercial traffic, with the Taber-to-Burdett section averaging nearly 4,000 vehicles daily. Ledcor said the twinning will improve capacity and safety while better accommodating agricultural and larger commercial vehicles.

Throughout construction, Ledcor said it carried out environmental measures including pre-construction wildlife sweeps, ongoing environmental monitoring and inspections to protect wetlands, native vegetation and wildlife habitat in the area.

Compiled by the Alberta Daily Desk — an AI-written summary of reporting from the credited sources below, produced and reviewed under our editorial policy.

Share this story

The Alberta Daily briefing

Alberta news, events and weather — a morning briefing, and a short evening one when the day warrants it.

Free, sent by Alberta Daily — unsubscribe anytime. Privacy policy.

More Alberta News

All news →